Small and Condo Bathroom Renovations in Vaughan
Short answer
Small and condo bathroom renovations make the most of a tight room with floating vanities, niches, clear glass and large tile, and work within condo board rules. In Vaughan, a small bathroom of about 5 x 8 ft runs $9,200 to $22,600 all-in depending on finishes. Condo jobs add board approval and booked elevator time.

Making the most of a compact bathroom
Are you planning to renovate a 5 x 8 ft bathroom or a condo suite where every inch counts? In a small bathroom, a vanity that is two inches too deep or a shower door that hits the toilet can make the room frustrating to use every day. Before we order a single fixture, we measure the room carefully and prepare layout drawings so you can see where the door clears, how much elbow room you have at the sink, and where towels and toiletries will live.
Across Vaughan, most of the compact bathrooms we renovate fall into four types:
- Condo suites at the Vaughan Metropolitan Centre and along Highway 7 in Concord, where the building is recent but the builder finishes are plain.
- 5 x 8 ft upstairs hall bathrooms in older Concord, Woodbridge and Thornhill houses, usually with an alcove tub.
- Main-floor powder rooms where homeowners want a cleaner vanity, statement tile and better mirror lighting.
- Compact basement bathrooms tucked beside a utility room or under the stairs.
Layout ideas that make a small bathroom feel larger
- A wall-hung floating vanity. Leaving open floor visible underneath the cabinet makes a narrow bathroom look wider and easier to mop.
- Recessed wall niches. Building storage between the studs keeps shampoo bottles off the tub rim or shower floor without sticking out into the space.
- Frameless clear glass. Swapping a shower curtain or heavy framed door for clear tempered glass lets your eye travel to the back wall of the walk-in shower.
- Large-format porcelain tile. Larger tiles mean fewer grout joints, and running the same floor tile into a curbless or low-curb shower visually lengthens the room.
- Full-height wall tile. Carrying shower tile right to the ceiling draws the eye upward and protects the upper drywall from steam.
- A pocket door or out-swing door. Where a standard door swing crowds the vanity or tub, changing the door hardware frees up the centre of the floor.
- Face-height mirror lighting. A backlit mirror or vertical sconces eliminate harsh overhead shadows in a windowless condo bathroom.
What a small or condo bathroom renovation costs in Vaughan
For a compact bathroom of around 5 x 8 ft, our all-in ranges (labour and finish materials together) are:
| Bathroom size | Finish level | All-in range |
|---|---|---|
| Small bathroomabout 5 x 8 ft | Cost-conscious refresh | $9,200 to $12,300 |
| Major upgrade, premium finishes | $18,500 to $22,600 |
Labour and materials together, in CAD before HST. Updated November 6, 2026.
For a 7 x 9 ft three-piece bathroom with a new tub, tile to the ceiling, vanity and lighting, our labour package starts at $8,000 before finish materials. In a high-rise condo, labour can run slightly higher than in a detached house because materials and debris must move through booked service elevators during shorter weekday work windows. See our Vaughan bathroom renovation cost breakdown for the full package and line-item tables.
How condo bathroom renovations work in Vaughan
When you renovate inside a condominium, the condo corporation owns the building structure and common elements, so you need management approval before demolition starts. Here is how we handle condo renovations in VMC towers and across York Region:
1. Review the building’s alteration rules
Ask your property management office for the suite renovation package. It sets out what requires board sign-off, the refundable security deposit, permitted working hours, and hallway protection rules.
2. Submit the scope and contractor documents
Management will ask for a written scope of work, plumbing and electrical details, and your contractor’s paperwork. We provide our WSIB clearance certificate and our certificate of liability insurance naming the condominium corporation, along with layout drawings if required.
3. Schedule around board approval and elevator bookings
Board or property manager sign-off usually takes one to three weeks. Once approved, we book the padded service elevator and loading bay so demolition debris leaves cleanly and new tile, vanities and glass come up in organized deliveries.
4. Respect weekday noise hours
Most Vaughan condo buildings restrict noisy work such as tile removal, core drilling and wet-saw cutting to weekday daytime hours, often 9 am to 5 pm. We sequence the trades so the job stays on schedule within those windows.
5. Working with concrete slabs and shared plumbing stacks
High-rise condo bathrooms sit on a poured concrete slab, and drain lines connect into vertical stacks shared with the suites above and below. Moving a toilet or shower drain through concrete is rarely permitted by condo corporations. The smart approach is to keep the fixtures in their existing spots and transform the room through better tile, a tub-to-shower conversion that uses the existing drain location, a floating vanity and custom glass. Because fixtures stay in the same place, a municipal permit is usually not needed either; see our article on bathroom renovation permits in Vaughan and our VMC condo upgrade notes.
See a finished two-bathroom condo project
In a recent condo renovation in Liberty Village, Toronto, we rebuilt both the main bathroom and the guest bath under full condo board rules, keeping the slab drains in place while installing a curbless glass shower, a walnut vanity, brass fixtures and a green marble-look corner shower. Read the Liberty Village condo bathroom case study.
Request an itemized condo or small-bathroom quote
Upload a few photos of your bathroom, your postal code, and your building’s alteration rules (if you already have them) through our free quote form. We will send a line-by-line written quote backed by our labour warranty.
Before and after
Real projects of this type. Drag the slider to compare.






Related projects

GTA project
Main bathroom in Calacatta-look tile
A dated beige main bathroom rebuilt with Calacatta-look wall tile, a new soaker tub with a glass panel, dark floor tile and a white shaker vanity.

Toronto project
Condo bathrooms in Liberty Village
Two condo bathrooms: a curbless glass shower with a walnut vanity in the main bath, and a green marble corner shower in the guest bath.

GTA project
Small main bathroom in white tile and marble hex
A small main bathroom refreshed with a new tub, white wall tile with hex-mosaic niches, a marble-look hex floor and a white vanity with brass accents.
Small & Condo Bathrooms: common questions
What paperwork does a condo usually ask for before a bathroom renovation?
Usually a renovation request form, a written scope, the contractor's WSIB clearance and certificate of insurance naming the corporation, and elevator and loading bookings. Some buildings also want drawings if plumbing moves. We help you prepare the package.
How do you make a small bathroom feel bigger?
Use a wall-hung or floating vanity, a recessed niche instead of a shelf, clear glass instead of a curtain, large-format tile with fewer grout lines, and good lighting at the mirror. Taking the tile to the ceiling also makes a low room feel taller.
Other bathroom services

Full Bathroom Renovation
Down to the studs and rebuilt, with new plumbing, waterproofing, tile and fixtures.

Ensuite Renovation
Builder corner-tub decks removed for walk-in glass showers, double vanities, freestanding tubs and heated floors.

Walk-in Showers
Tiled walk-in and curbless showers with glass, niches, benches and linear drains.

Tub-to-Shower Conversion
Replace a bathtub with a tiled walk-in shower that is easier to step into.

Bathtub Replacement
New alcove, drop-in or freestanding tubs, with the wall and floor rebuilt properly around them.

Basement Bathrooms
New basement bathrooms on existing rough-ins, or with drains added through the slab.

Accessible Bathrooms
Curbless showers, grab bars, seats and comfort-height fixtures for safer daily use.

Bathroom Repairs
Leaks into the ceiling below, failed showers, mould and fixing another contractor's work.

Powder Room Renovation
Main-floor 2-piece half baths rebuilt with floating vanities, stone tops, feature tile, skirted toilets and layered lighting.