Skip to content
Bathroom Renovation Vaughan

Upgrading a Builder-Grade Ensuite or VMC Condo Bathroom in Vaughan

By Bathroom Renovation Vaughan team · Updated

Frameless glass walk-in shower with overhead rain head built where a corner tub stood, beside a matching black makeup vanity desk
Shower and makeup desk where the corner tub used to be. (GTA project)

Short answer

Most builder-grade ensuites in Vaughan can be transformed without moving every drain: remove the corner tub and fibreglass stall, build one large tiled walk-in shower, and install a double vanity with a quartz top. Our labour package for a 9 x 12 ft ensuite with a curbless shower and moved drains is $11,500, before finish materials.

If you live in a Vaughan subdivision built between the 1990s and the 2010s—across Vellore Village, Maple, Patterson or Sonoma Heights—there is a good chance your primary ensuite has the same builder layout as your neighbours’. Meanwhile, homeowners in the newer condo towers around the Vaughan Metropolitan Centre and Concord often have the opposite situation: a brand-new building where the suite came with basic builder tile and a compact vanity. Here is how to get the most out of upgrading either bathroom.

What “builder-grade” looks like in a Vaughan home

Builder-grade simply means the standard fixture package a homebuilder installed to keep construction fast and predictable across hundreds of houses. In a Vaughan subdivision ensuite, that almost always includes:

  • A large acrylic corner soaker tub set into a tiled deck that takes up a third of the room.
  • A small fibreglass or acrylic shower stall with a framed glass door.
  • 12 x 12 inch ceramic floor tile with wide grout joints.
  • A single-sink or narrow double vanity with a laminate or cultured-marble top.
  • A noisy builder exhaust fan wired to the light switch.

After 15 to 25 years, the acrylic stall looks dull, the caulking around the corner tub deck has been patched several times, and the layout wastes floor space. The upside is that the underlying plumbing in these Vaughan neighbourhoods is usually in decent condition, which gives you strong options for a remodel.

Builder primary ensuite before renovation showing a bulky tiled corner soaker tub deck beneath two windows
A typical builder ensuite corner tub before renovation. (GTA project)

Four upgrades that change a subdivision ensuite most

1. Replace the corner tub and stall with one walk-in shower

Taking out both the unused corner tub deck and the cramped stall shower transforms the room. In their place, you have the wall length for a generous tiled walk-in shower with frameless glass, a built-in bench, a recessed shampoo niche and a handheld shower alongside a rain head.

If the new shower drain stays close to the old stall drain, the plumbing work is modest. If the drain moves to centre the new shower or fit a linear channel, the City of Vaughan classifies that as a plumbing alteration requiring a building permit. Source: City of Vaughan: Plumbing permits (accessed October 10, 2026) See our tub-to-shower conversion page and the charcoal marble ensuite case study for finished examples.

Builder primary ensuite before renovation showing a bulky tiled corner soaker tub deck beneath two windows
Frameless glass walk-in shower with overhead rain head built where a corner tub stood, beside a matching black makeup vanity desk
BeforeAfter
Corner tub to walk-in shower (GTA project)

2. Upgrade to a double vanity with a quartz or stone top

Replacing the builder cabinet with a double vanity—either freestanding or wall-hung—with a quartz countertop, undermount sinks and tall linen storage makes mornings much easier. Swapping a vanity and countertop in the same location does not require a building permit in Vaughan. Source: City of Vaughan: Building Permits (when permits are not required) (accessed October 10, 2026)

3. Carry large-format porcelain tile across the floor

Replacing small builder squares with large-format porcelain tile cuts down on grout lines and makes the room look wider. When the floor structure allows a curbless shower entry, the same tile can run seamlessly into the shower area.

4. Improve the lighting and exhaust fan

Adding recessed pot lights, face-level vanity lighting and a quiet, properly sized exhaust fan ducted outside keeps mirrors clear and prevents moisture damage.

Should you keep a bathtub in the primary ensuite?

Before removing the corner tub, check whether you still have a bathtub in the main upstairs hall bath. Many buyers with young children want at least one tub in the house. When the hall bathroom keeps its alcove tub, turning the primary ensuite into a walk-in shower room is usually a positive for resale. If you want a tub in the ensuite as well, a compact freestanding tub uses far less floor space than the old corner deck; see our bathtub replacement page.

What a builder-grade ensuite upgrade costs in Vaughan

Our published labour package for a 9 x 12 ft four-piece primary ensuite covers removing the old tub deck, stall and bulkhead, relocating the toilet and shower drains, building a curbless glass shower with a niche and bench, installing a double vanity, a two-way rain and hand shower, pot lights, an exhaust fan and a one-piece toilet for $11,500 before finish materials. All-in, an average primary ensuite renovation in Vaughan comes to about $30,000 or more, depending on tile, glass and cabinetry selections.

Primary ensuite labour package in Vaughan
BathroomWhat's includedLabour from
4-piece primary ensuite with curbless shower9 x 12 ft
  • Remove fixtures and the bulkhead
  • Drywall for the shower walls, framing for the toilet and tub
  • Relocate the toilet and shower drains
  • Single vanity upgraded to a double sink
  • Full glass enclosure on a curbless shower base
  • 2-way shower set with rain head, custom niche and bench
  • 4 pot lights, 2 vanity lights, fan and a one-piece toilet
$11,500

Labour and installation only; finish materials (tile, tub, fixtures, vanity, glass) are extra. Prices in CAD before HST, updated November 6, 2026.

Compare all three packages and room-size ranges on our Vaughan bathroom renovation cost page or read about our full bathroom renovation service.

Upgrading a VMC or Concord condo bathroom

High-rise suites around the Vaughan Metropolitan Centre and along Highway 7 are newer, so the goal is usually replacing basic builder finishes—a plain alcove tub surround, a narrow vanity and dim lighting—with custom tile, frameless glass and better storage.

In a condominium, the workflow is shaped by building rules:

  • Condo board approval comes first. Property management requires an alteration request, a written scope of work, and our WSIB clearance certificate and certificate of liability insurance naming the condominium corporation.
  • Service elevator and loading bay bookings. Demolition debris and new materials travel through padded elevators during reserved time slots.
  • Weekday daytime noise windows. Tile removal and cutting are scheduled strictly within the building’s permitted hours.
  • Concrete slab plumbing stays in place. Because drain pipes run through the poured concrete floor slab, toilets, tubs and showers stay in their existing footprints while everything above the slab is upgraded.

Our small and condo bathrooms in Vaughan page explains how we prepare the board package for you, and our Liberty Village condo bathroom case study shows two condo bathrooms we renovated under these exact rules.

Practical steps before you begin

To see what your ensuite or condo bathroom would cost to upgrade, upload a few photos through our quote form. We will send an itemized written quote backed by our labour warranty.

Sources

Ensuite upgrade questions

What does builder-grade mean in a Vaughan subdivision home?

It means the standard finishes the builder installed to keep the sale price down: a fibreglass or acrylic shower, a corner soaker tub, small floor tile, a single-sink vanity with a laminate or cultured marble top, and a basic exhaust fan. They work, but after 15 to 25 years they look dated and often show wear at the shower and tub.

Which ensuite upgrade makes the biggest difference?

Replacing a fibreglass shower and corner tub with a tiled walk-in shower changes the room more than anything else. A double floating vanity with a stone top, better lighting and large-format floor tile come next.

Want a second opinion on your plans?