Skip to content
Bathroom Renovation Vaughan

Full Bathroom Renovation in Vaughan

Short answer

A full bathroom renovation takes the room back to the studs and rebuilds it with new plumbing, waterproofing, tile, lighting and fixtures. In Vaughan our labour packages start at $8,000 for a 7 x 9 ft main bathroom; all-in, a typical main bathroom is about $14,000 and a primary ensuite $30,000 or more. Most take three to five weeks on site.

Five-piece primary ensuite with a freestanding white soaking tub beneath the window, floor-to-ceiling veined marble porcelain and a frameless glass shower
Primary bathroom in marble-look porcelain (GTA project)

What a full bathroom renovation includes

Are you planning a complete bathroom remodel where the old tile, tub and vanity all come out? A full renovation strips the room back to the studs and subfloor so everything underneath can be inspected and rebuilt properly before new finishes go in. In a Vaughan home built in the 1990s or 2000s, opening the walls often reveals a shower valve that has been weeping slowly, a subfloor softened around the toilet flange, or an exhaust fan that was never ducted outside.

Once the room is open and any hidden issues are repaired, the rebuild follows a clear sequence:

  • Rough plumbing and electrical. Drain lines, water supply pipes, a new shower mixing valve, GFCI outlets, and circuits for heated floors, pot lights or backlit mirrors.
  • Framing and solid backing. Framing for recessed shampoo niches, shower benches and half-walls, plus wood blocking behind the tile for grab bars, towel bars and heavy glass hinges.
  • Continuous waterproofing. A bonded waterproofing membrane across the entire shower floor, walls, bench and niche, with sealed corners and drain connection.
  • Tile setting. Floor tile, shower walls and feature walls laid out from the centre lines on your approved drawings so narrow cuts never land in plain sight.
  • Fixtures and finishing. Vanity and quartz or stone countertop, toilet, bathtub replacement or custom shower glass, faucets, mirrors, lighting and paint.

Three kinds of Vaughan bathrooms we rebuild most

Most of the full renovations we build across Vaughan’s neighbourhoods fall into one of three groups, and each one calls for a slightly different scope.

The 3-piece family main bathroom

The hall bathroom in a Maple, Woodbridge or Thornhill home is usually a 5 x 8 ft or 7 x 9 ft room with an alcove tub, a single vanity and a toilet. Because the footprint is compact, the improvements come from thoughtful details: a deeper soaking tub, porcelain tile carried to the ceiling, a two-shelf recessed niche instead of a hanging caddy, a wall-to-wall vanity and brighter lighting. Our labour package for this room is $8,000 and covers removing the old fixtures and bulkhead, installing a new tub with a 3-way shower kit, marble-look wall porcelain, dark floor tile, a quiet exhaust fan, three pot lights and a built-in vanity with a quartz top. Finish materials are extra. See our Calacatta-look main bathroom case study for a finished example.

The builder-grade subdivision ensuite

Homes in Vellore Village, Patterson and Sonoma Heights often share the same upstairs layout: a corner soaker tub on a tiled deck, a small fibreglass stall shower, and a builder vanity with a laminate or cultured-marble top. Our 9 x 12 ft four-piece labour package at $11,500 covers removing the corner deck and stall, relocating the toilet and shower drains, building a curbless walk-in shower with frameless glass, a niche and bench, and upgrading a single sink to a double vanity. Read our article on upgrading a builder-grade ensuite in Vaughan and see the charcoal marble ensuite case study.

The custom or estate primary ensuite

In Kleinburg and Islington Woods, primary bathrooms are larger and often combine a freestanding tub with a floor-mounted filler, a walk-in or wet-room shower behind a single glass screen, heated floors and custom stone vanity tops. Our 15 x 8 ft wet-room package starts at $15,000 in labour, including relocated rough-ins for the shower, toilet and vanity. All-in, larger primary ensuites typically start around $30,000 and go up with stone, custom cabinetry and fixture selections.

Labour and installation packages
BathroomWhat's includedLabour from
Main bathroom with new tub7 x 9 ft
  • Remove the existing tub, bulkhead and fixtures
  • New bathtub with a 3-way shower kit
  • Marble-look porcelain on the walls, dark porcelain on the floor
  • Plumbing, bathroom fan and 3 pot lights
  • Built-in wall-to-wall vanity with a custom quartz top
  • Tile baseboard and a sliding glass tub door
$8,000
4-piece primary ensuite with curbless shower9 x 12 ft
  • Remove fixtures and the bulkhead
  • Drywall for the shower walls, framing for the toilet and tub
  • Relocate the toilet and shower drains
  • Single vanity upgraded to a double sink
  • Full glass enclosure on a curbless shower base
  • 2-way shower set with rain head, custom niche and bench
  • 4 pot lights, 2 vanity lights, fan and a one-piece toilet
$11,500
Wet room with shower and jetted tub15 x 8 ft
  • Remove old fixtures, waterproof walls and floors
  • Relocate the shower, toilet and vanity rough-ins
  • Wall and floor tile throughout
  • Double floating vanity
  • 2-way shower with rain head
  • One continuous wet area for the shower and tub, with a bench along both
$15,000

Labour and installation only; finish materials (tile, tub, fixtures, vanity, glass) are extra. Prices in CAD before HST, updated November 6, 2026.

What moves the price of a full renovation

The square footage of the bathroom matters less than most homeowners expect. Moving plumbing, the style of shower you choose, and your tile and fixture selections move the total much more.

  • Moving plumbing

    Relocating a toilet, shower drain or vanity rough-in adds framing, plumbing and often a permit.

  • Size and tile coverage

    Floor-to-ceiling tile, large-format slabs and mosaic floors add material and setting time.

  • Shower type

    Curbless showers need a recessed or sloped floor and full waterproofing; glass enclosures add a measured install.

  • Fixtures and finishes

    Vanities, faucets, stone tops and glass are where budgets move the most.

  • What we find behind the walls

    Old leaks, rot, mould or undersized venting must be fixed before new tile goes up.

  • Condo logistics

    Board approval, elevator bookings and restricted work hours add time to the schedule.

  • Permits

    Changes to plumbing layout or structure need a building permit; a like-for-like swap usually does not.

For all-in ranges by room size and individual line-item prices, see our Vaughan bathroom renovation cost breakdown.

Waterproofing and ventilation behind the walls

Two parts of the build decide whether a renovated bathroom still looks and smells fresh ten years later, and both are hidden once the tile is grouted.

First is waterproofing. Tile and grout are water-resistant, not waterproof. Behind them, every shower needs a continuous membrane over the walls, floor, niche and bench, lapped at every seam and sealed tightly to the drain and mixing valve. Whoever you hire, ask to see photos of their showers at the waterproofing stage before tile is set.

Second is ventilation. Many of the bathroom repair calls we take in Vaughan trace back to a builder fan that is too weak for the room or vents into the attic insulation. Peeling paint, damp drywall corners and lingering humidity are the warning signs. While the ceiling is open during a full renovation, installing a quiet, properly sized fan ducted outside is straightforward and well worth doing.

Vanity tops, waterproof wall boards and bathroom paint

Choosing the right surface materials keeps a renovated bathroom easy to wipe down and prevents steam damage:

  • Why tile over plain drywall or greenboard fails in showers: Moisture-resistant green drywall is meant for dry bathroom walls outside the shower, not inside a wet enclosure. Setting tile directly onto drywall allows moisture through the grout joints to soften the paper face and loosen tiles. Inside every shower and tub surround, we install waterproof backer board sealed with a continuous membrane.
  • Quartz and porcelain versus cultured polymarble vanity tops: Many original Vaughan bathrooms came with a one-piece moulded polymarble sink top, which yellows and scratches over time. Upgrading to a non-porous engineered quartz countertop with an undermount ceramic basin—or a solid porcelain slab top—resists hair-dye stains, hot styling tools and daily wear.
  • Moisture-resistant paint on ceilings and dry walls: Even with a strong exhaust fan, upper walls and ceilings face daily humidity. On painted surfaces outside the tiled zones, we prime with a moisture-blocking sealer and apply mildew-resistant satin or kitchen-and-bath acrylic latex paint so water vapour beads off instead of blistering the drywall.

Permits for a full bathroom renovation in Vaughan

Whether your renovation requires a building permit depends on the plumbing layout. Replacing a tub, toilet or vanity in the exact same spot does not require a municipal building permit. Moving or adding plumbing fixtures does: the City of Vaughan requires a permit “for any addition or alteration of plumbing fixtures, water and sewer services.”

Source: City of Vaughan: Plumbing permits (accessed October 10, 2026)

In practice, a like-for-like main bathroom remodel usually proceeds without a permit, while an ensuite renovation that moves the toilet or shower drain needs one. We confirm which rule applies in your written quote. Electrical upgrades such as pot lights or heated floors are inspected through the Electrical Safety Authority rather than the City. Read our full article on bathroom renovation permits in Vaughan.

Typical timeline and how we quote

Most full bathroom renovations take three to five weeks on site:

  1. Home protection, demolition and framing check: one to two days.
  2. Rough plumbing, electrical, fan ducting and framing: three to five days.
  3. Waterproofing membrane and tile installation: one to two weeks, depending on tile size and layout.
  4. Vanity, countertop, toilet, faucets, lighting and paint: three to five days.
  5. Custom shower glass measurement and installation: measured on finished tile and installed as the final step.

Before on-site work begins, allow time for layout drawings, finish selections and any municipal permit or condo board review. If your suite is in a high-rise near the Vaughan Metropolitan Centre, see our small and condo bathrooms page for how board approvals work.

To get started, upload a few photos or a short video through our free quote form. We send an itemized written quote first, follow up with an in-home measurement visit and layout drawings, and back the completed room with our written labour warranty.

Before and after

Real projects of this type. Drag the slider to compare.

Bathroom before renovation showing an older acrylic bathtub and brown ceramic tile surround
Same alcove after tub-to-shower conversion with a curbless walk-in shower, recessed niche and built-in tiled bench
BeforeAfter
Accessible bathroom: tub out, curbless shower in: Tub and surround replaced with a curbless shower (GTA project)
Bathroom before renovation with orange painted walls, dated vanity area and worn wood-look flooring
Same bathroom after renovation with a white floating vanity, backlit LED mirror and matte grey porcelain floor tile
BeforeAfter
Accessible bathroom: tub out, curbless shower in: Vanity wall (GTA project)
Main bathroom before renovation showing dated beige 4-inch tile, original bathtub and toilet
Renovated 3-piece main bathroom with Calacatta-look porcelain wall tile around a deep alcove tub, frameless glass splash panel, charcoal floor tile and white vanity
BeforeAfter
Main bathroom in Calacatta-look tile: Tub wall (GTA project)
Main bathroom vanity before renovation with a honey-oak cabinet and beige cultured-marble countertop
White shaker bathroom vanity with grey quartz countertop and chrome faucet on dark porcelain floor tile
BeforeAfter
Main bathroom in Calacatta-look tile: Vanity (GTA project)

Related projects

Full Bathroom Renovation: common questions

Should I upgrade the exhaust fan during my bathroom renovation?

Almost always. Many older fans are too weak for the room or vent into the attic instead of outside, which leads to peeling paint and mould on the ceiling. During a renovation the ceiling is open, so it is the cheapest time to fit a quieter, correctly sized fan ducted to the outside.

Can you add a heated floor to my new bathroom?

Yes. An electric heating mat goes under the tile with its own thermostat. It needs a dedicated circuit from a licensed electrician, so tell us early and we will price it into your quote and plan it with the tile layout.

What happens if you find mould or rot behind the walls?

We stop, show you, and explain the fix before we continue. Wet drywall, rotted subfloor or framing has to be removed and replaced before new waterproofing and tile go up. Your quote states how we price hidden damage, so there are no surprises in the final bill.

  • Renovated primary ensuite with a grey shaker double vanity, tall flanking linen cabinets and a frameless glass walk-in shower

    Ensuite Renovation

    Builder corner-tub decks removed for walk-in glass showers, double vanities, freestanding tubs and heated floors.

  • Frameless 10 mm glass walk-in shower clad in large-format grey porcelain slabs with a built-in bench and warm LED accent lighting

    Walk-in Showers

    Tiled walk-in and curbless showers with glass, niches, benches and linear drains.

  • Walk-in shower clad in grey stone-look porcelain tile with a recessed niche, overhead rain head and frameless glass screen

    Tub-to-Shower Conversion

    Replace a bathtub with a tiled walk-in shower that is easier to step into.

  • Freestanding white oval soaking tub set in front of a window with large-format grey porcelain wall tile and a frameless glass shower beside it

    Bathtub Replacement

    New alcove, drop-in or freestanding tubs, with the wall and floor rebuilt properly around them.

  • Corner frameless glass walk-in shower with green marble-look porcelain slabs and brushed brass hardware in a Toronto condo bathroom

    Small & Condo Bathrooms

    Compact bathrooms and condo suites, planned around space, board rules and elevator bookings.

  • Finished basement 3-piece bathroom with a frameless glass walk-in shower in veined marble-look porcelain, recessed niche and corner bench

    Basement Bathrooms

    New basement bathrooms on existing rough-ins, or with drains added through the slab.

  • Barrier-free curbless walk-in shower with large-format white wall tile, recessed shampoo niche, overhead rain head and slide-bar handheld sprayer

    Accessible Bathrooms

    Curbless showers, grab bars, seats and comfort-height fixtures for safer daily use.

  • Walk-in shower during construction showing walls, bench and recessed niche built from waterproof foam backer board with sealed joints before tiling

    Bathroom Repairs

    Leaks into the ceiling below, failed showers, mould and fixing another contractor's work.

  • Basement two-piece powder room with matte grey walls, white floating vanity and one-piece toilet

    Powder Room Renovation

    Main-floor 2-piece half baths rebuilt with floating vanities, stone tops, feature tile, skirted toilets and layered lighting.

Get a written quote for your full bathroom renovation