Skip to content
Bathroom Renovation Vaughan

Bathroom Renovation Cost in Vaughan (2026)

Published Vaughan labour packages, all-in ranges by bathroom size, individual line-item prices, and what moves the number up or down in a Vaughan home.

Renovated 3-piece main bathroom with Calacatta-look porcelain wall tile around a deep alcove tub, frameless glass splash panel, charcoal floor tile and white vanity
Main bathroom in Calacatta-look tile (GTA project)

Short answer

Our Vaughan labour packages start at $8,000 for a 7 x 9 ft main bathroom with a new tub, $11,500 for a 9 x 12 ft four-piece ensuite with a curbless shower and moved drains, and $15,000 for a 15 x 8 ft wet room. Finish materials are extra. All-in, a typical main bathroom comes to about $14,000 and a primary ensuite $30,000 or more.

When you start planning a bathroom renovation, one of the first things you want to know is what the project will cost. Most renovation companies will not publish a number, which means you have to book an in-home visit just to find out whether your 2-piece powder room, 3-piece main bathroom, 4-piece family bath or 5-piece primary ensuite fits your budget. We publish the same figures we quote from, in Canadian dollars before HST, so you can plan with clear numbers from the start.

There are two kinds of numbers below. Labour packages cover our work on site: demolition, plumbing, electrical, framing, waterproofing, tile setting, fixture installation and clean-up. All-in ranges add typical mid-range finish materials, including tile, the tub, the vanity, fixtures and glass, so you can see where most finished bathrooms land.

Labour packages

Three packages cover most of the bathrooms we build in Vaughan. Each one lists what is included so you can compare it line for line with any other written quote.

Labour and installation packages
BathroomWhat's includedLabour from
Main bathroom with new tub7 x 9 ft
  • Remove the existing tub, bulkhead and fixtures
  • New bathtub with a 3-way shower kit
  • Marble-look porcelain on the walls, dark porcelain on the floor
  • Plumbing, bathroom fan and 3 pot lights
  • Built-in wall-to-wall vanity with a custom quartz top
  • Tile baseboard and a sliding glass tub door
$8,000
4-piece primary ensuite with curbless shower9 x 12 ft
  • Remove fixtures and the bulkhead
  • Drywall for the shower walls, framing for the toilet and tub
  • Relocate the toilet and shower drains
  • Single vanity upgraded to a double sink
  • Full glass enclosure on a curbless shower base
  • 2-way shower set with rain head, custom niche and bench
  • 4 pot lights, 2 vanity lights, fan and a one-piece toilet
$11,500
Wet room with shower and jetted tub15 x 8 ft
  • Remove old fixtures, waterproof walls and floors
  • Relocate the shower, toilet and vanity rough-ins
  • Wall and floor tile throughout
  • Double floating vanity
  • 2-way shower with rain head
  • One continuous wet area for the shower and tub, with a bench along both
$15,000

Labour and installation only; finish materials (tile, tub, fixtures, vanity, glass) are extra. Prices in CAD before HST, updated November 6, 2026.

The 7 x 9 ft package fits the standard main bathroom in a Maple, Woodbridge or Thornhill family home: tub, toilet and vanity on one wall or two, with the layout kept as it is. See our Calacatta-look main bathroom case study for a room of this type. The 9 x 12 ft package fits the builder-grade ensuite common in Vellore Village, Patterson and Sonoma Heights, where the corner tub and stall shower come out and a curbless walk-in shower and double vanity go in. The wet room suits the larger primary bathrooms in Kleinburg and Islington Woods, where the shower and freestanding tub share one waterproofed area.

What most bathrooms cost all-in

Labour is only part of the budget. Once you add tile, the vanity, the tub or shower glass, faucets and the toilet, most finished bathrooms in Vaughan fall into these ranges.

  • Typical guest or main bathroom

    $14,000

    Labour and mid-range finish materials together.

  • Average primary ensuite

    $30,000+

    Larger rooms, more tile, glass and plumbing changes.

  • Curbless accessible tub-to-shower conversion

    $15,000

    A recent curbless, accessible conversion of ours.

Cost by bathroom size and finish level

If you know roughly how big your bathroom is and the finish level you have in mind, the table below is the quickest way to place your project.

All-in cost by bathroom size and finish level
Bathroom sizeFinish levelAll-in range
Small bathroomabout 5 x 8 ftCost-conscious refresh$9,200 to $12,300
Major upgrade, premium finishes$18,500 to $22,600
Mid-size bathroomabout 10 x 10 ftStandard finishes$12,300 to $14,400
High-end finishes$19,500 to $25,700
Premium features$25,700 to $30,900
Large bathroom or ensuiteover 10 x 10 ftEconomical$14,400 to $18,500
Standard$18,500 to $25,700
Top of the range$30,900 to $41,200

Labour and materials together, in CAD before HST. Updated November 6, 2026.

A small 5 x 8 ft main bathroom or small condo bathroom with porcelain tile and a stock vanity sits near the low end of its band. The same room with a custom vanity, a quartz or stone top, a frameless glass panel and floor-to-ceiling tile sits near the top. In a larger primary ensuite, the jump between bands usually comes from three choices: a curbless shower, a freestanding tub with a floor-mounted filler, and natural stone.

2-piece, 3-piece, 4-piece and 5-piece bathroom costs explained

When comparing renovation prices in Vaughan, it helps to know how builders and contractors count fixtures:

  • 2-piece bathroom (powder room): Contains a toilet and a sink vanity ($9,200 to $12,300 all-in for a standard refresh; see powder room renovations). Because there is no tub or shower waterproofing, most of the budget goes into the vanity, stone top, floor tile and lighting.
  • 3-piece bathroom: Contains a sink, a toilet, and either an alcove tub/shower combo or a stand-alone walk-in shower. Our 7 x 9 ft labour package starts at $8,000, with typical all-in projects averaging around $14,000.
  • 4-piece bathroom: Includes a sink vanity, a toilet, a separate bathtub and a separate walk-in shower—or a double-sink vanity, toilet and large walk-in shower. Our 9 x 12 ft four-piece labour package is $11,500.
  • 5-piece primary ensuite: Combines a double-sink vanity (two basins), a toilet, a freestanding or soaking tub, and a separate walk-in shower or wet room ($15,000 wet-room labour package; $30,000 or more all-in; see primary and ensuite renovations).

Line-item prices

Every written quote we send breaks the job into sections, each with its own price. These are the individual line items homeowners ask about most often.

Typical line items on a bathroom quote
ItemTypical costNotes
Demolition and clean-upabout $1,500Wall-to-wall removal, disposal and site protection.
Licensed plumbing and electrical$70 to $120 per hourElectrical work is inspected by the Electrical Safety Authority; plumbing changes need a building permit.
Pot lightsabout $250 each, installedWet-rated where they sit over the shower or tub.
Tile (material)$10 to $100 per sq ftPorcelain at the low end, marble mosaics at the top.
Tile installation$5 to $15 per sq ftLarge-format, mosaic and pattern layouts cost more to set.
Stone vanity top$50 to $200 per sq ft, installedQuartz and natural stone, priced by grade.
Vanity$500 to $1,500, plus $300 to $600 to installSolid wood vanities often start around $2,000.

Two details are worth keeping in mind when you compare quotes. First, tile material and tile installation are separate costs: a large porcelain slab and a small marble mosaic take very different amounts of time to set, and a lump-sum allowance hides that difference. Second, plumbing and electrical work is billed by the hour because no two walls are the same once they are opened. Your quote should state how many hours are allowed for, and our contractor vetting checklist explains what else should be written down before you sign.

What moves the price

The size of the room matters less than people expect. Plumbing changes, the shower construction and your finish choices move the total much more.

  • Moving plumbing

    Relocating a toilet, shower drain or vanity rough-in adds framing, plumbing and often a permit.

  • Size and tile coverage

    Floor-to-ceiling tile, large-format slabs and mosaic floors add material and setting time.

  • Shower type

    Curbless showers need a recessed or sloped floor and full waterproofing; glass enclosures add a measured install.

  • Fixtures and finishes

    Vanities, faucets, stone tops and glass are where budgets move the most.

  • What we find behind the walls

    Old leaks, rot, mould or undersized venting must be fixed before new tile goes up.

  • Condo logistics

    Board approval, elevator bookings and restricted work hours add time to the schedule.

  • Permits

    Changes to plumbing layout or structure need a building permit; a like-for-like swap usually does not.

The biggest single decision is whether the layout stays. In Vaughan, keeping fixtures in the same place means no plumbing permit, no new drain lines under the floor and fewer hours of plumbing. Moving the toilet across the room, or relocating the shower drain to another wall, adds framing, pipe, a permit application and inspection time. In many builder-grade ensuite upgrades, moving the drain is what makes the new layout work, so it is simply a choice to make with the full cost in front of you.

Can you renovate a bathroom for $10,000?

In labour, yes for a smaller main bathroom. Our 7 x 9 ft package covers removal, a new tub with a shower kit, wall and floor tile, plumbing, a fan, pot lights, a built-in vanity with a quartz top and a sliding glass tub door for $8,000 before materials. Choose porcelain tile, a stock vanity and mid-range fixtures and most homeowners land a little above $10,000 all-in.

Ways to keep the budget near that mark:

  • Keep the toilet, tub and vanity where they are.
  • Use porcelain rather than natural stone, and keep full-height tile to the tub or shower walls.
  • Choose a standard alcove tub instead of a freestanding one; see bathtub replacement for the difference in plumbing.
  • Select every finish before demolition starts so nothing is ordered twice.

What should never be cut to save money is the waterproofing behind the tile. It is a small share of the budget and the main reason a shower lasts without leaking into the room below.

Where bathroom budgets go wrong

When a renovation runs over budget, the problem usually traces back to one of four things.

  1. A lump-sum quote. A single number with a short scope leaves room for extras later. An itemized written quote is the best protection you have.
  2. No allowance for what is behind the walls. In a bathroom that is twenty or thirty years old, opening the walls often turns up an old leak at the tub drain, a soft subfloor around the toilet, or a fan that vents into the attic. If you already see a ceiling mark or cracked tile, our bathroom repairs service can diagnose the source before you plan the rest of the room.
  3. Design changes after demolition. Moving a niche or changing the tile layout once the walls are open costs time and material. Drawings and a 3D plan before work starts avoid that.
  4. Cutting corners on the valve or waterproofing. A cheap shower valve or skipped membrane fails inside the wall, where fixing it means removing new tile.

Acrylic liners and surrounds versus a full renovation

Acrylic tub liners and wall surrounds fit over existing fixtures. They go in faster and cost less up front, which is why they are heavily advertised.

Liner or surround compared with a full renovation
ComparedLiner or acrylic surroundFull renovation
What happens to the old tub and wallsCovered and left in placeRemoved, and the walls are rebuilt
Hidden leaks, rot or mouldCovered, not fixedFound and repaired before new tile
Plumbing and valveUsually left as isReplaced, with the option to move fixtures
Layout and design choiceLimited to the system's panels and coloursAny tile, layout, niche, bench or glass
WaterproofingRelies on the liner's seams and caulkingA continuous membrane behind the tile

If the walls are dry, the tub is sound and you only want a fresh surface, a liner can be enough. If you have seen a stain on the ceiling below, soft drywall near the tub, or the bathroom is twenty or more years old, opening the walls for a full bathroom renovation or a proper tub-to-shower conversion lets us fix what is underneath before new finishes go on.

Permits and what they mean for cost

The City of Vaughan does not require a building permit to replace existing plumbing fixtures, cupboards or counter tops in the same place. It does require one for any addition or alteration of plumbing fixtures, water or sewer services, and for finishing a basement or adding a basement bathroom. Source: City of Vaughan: Building Permits (when permits are not required) (accessed October 10, 2026)

For your budget, a like-for-like renovation carries no permit fee and no permit wait. A layout change adds the application fee, drawings and inspection visits, plus the City’s review window before demolition begins. Our article on bathroom renovation permits in Vaughan explains who applies and what the drawings show.

How payments work

Your written quote sets out every payment and the stage of work it is tied to before you sign anything, so you know in advance what is due and when. Under Ontario’s Consumer Protection Act, a written estimate made part of the contract also caps the final price within 10% unless you agree in writing to new work.

Whoever you hire, avoid paying most of the contract up front, and make sure every payment matches a stage you can see completed on site.

Tax credits for accessibility work

Two government tax credits can reduce the cost of accessibility upgrades for qualifying households. Eligibility depends on your personal tax situation, so confirm the details with the Canada Revenue Agency, Ontario’s Ministry of Finance or your accountant before counting on either credit.

  • Home Accessibility Tax Credit (federal). A non-refundable credit on up to $20,000 a year of eligible expenses for renovations that make a home safer or more accessible for someone who is 65 or older, or who qualifies for the disability tax credit. It is claimed on line 31285 of the tax return. Source: Canada Revenue Agency: Line 31285, Home accessibility expenses (accessed October 10, 2026)
  • Ontario Seniors Care at Home Tax Credit. A refundable credit for low- to moderate-income seniors aged 70 and older, worth 25% of up to $6,000 in eligible medical expenses, to a maximum of $1,500. Source: Government of Ontario: Ontario Seniors Care at Home Tax Credit (accessed October 10, 2026)

Keep every invoice and a clear description of the work. Our accessible bathroom renovations page covers the features that commonly qualify, such as curbless showers, grab bars and built-in seats.

Getting an itemized quote for your bathroom

The fastest way to get an accurate price is to send photos or a short video of your bathroom. Show the floor, the ceiling, the tub or shower, and the plumbing inside the vanity cabinet. Our photo quotes usually match the final price, and where something cannot be seen until the room is measured in person, we note that clearly in writing.

You receive an itemized written quote, followed by layout drawings and a 3D plan before any work begins. Request your free quote or contact our Vaughan team if you have a question first.

Bathroom cost questions

Can I renovate my bathroom for $10,000?

In labour, yes for a smaller main bathroom: our 7 x 9 ft package with a new tub, shower kit, tile, vanity with quartz top, fan and pot lights is $8,000 before finish materials. Add your tile, tub, fixtures and vanity and most people land above $10,000. Keeping the layout and choosing porcelain over stone are the two biggest savings.

Do your prices include tile, fixtures and the vanity?

Our package prices cover labour and installation; finish materials such as tile, the vanity, faucets, the toilet and glass are extra. That way you choose finishes at the price point you want. Your quote lists both sides line by line, and our all-in guidance figures include typical mid-range materials.

What is the most expensive part of a bathroom renovation?

Moving plumbing and the shower are usually the two biggest costs. Relocating a toilet or drain means opening the floor, new pipe and often a permit. A tiled, fully waterproofed shower with custom glass is the most labour-heavy part of the room. Stone tops and large-format tile come next.

What are the most common bathroom renovation budget mistakes?

Choosing a contractor on the lowest number without a line-by-line scope, skipping waterproofing behind the tile, keeping an undersized exhaust fan, and leaving no allowance for what is found behind the walls. Changing the design mid-job is another: decide the layout and finishes before demolition starts.

How accurate is a quote from photos and video?

Very close in most cases. When you send clear photos or a short video of the room, including the floor, the ceiling and the area under the vanity, our photo quote usually matches the final price. If something cannot be seen, such as the condition of the subfloor, we say so in writing and confirm it at the in-home visit.

How do payments work on a bathroom renovation?

Your written quote sets out every payment and the stage of work it is tied to before you sign anything. Whoever you hire, avoid paying most of the price before work starts. A staged schedule protects you and keeps the project moving.

Is an acrylic tub liner cheaper than a full bathroom renovation?

Yes, a liner or acrylic surround costs less up front because nothing comes out of the wall. The trade-off is that the old tub, drain, valve and wall stay behind it, so a slow leak, failed backer board or mould is covered rather than fixed. If the walls are sound and you only want a new surface, a liner can make sense.

Get an itemized price for your bathroom

Send a few photos or a short video. You will get a written quote with every line priced, usually close to the final number.