Walk-in Showers in Vaughan
Short answer
A walk-in shower is a tiled shower you step into without a tub, closed with glass or left open. Ours are fully waterproofed and built with niches, benches and curbless or low-curb entries. In Vaughan, our labour price for a 9 x 12 ft ensuite with a curbless shower, glass, niche and bench starts at $11,500.

Who a tiled walk-in shower suits
Are you thinking about replacing a cramped stall shower or an unused corner tub with a spacious walk-in shower? In Vaughan, most of the walk-in showers we build replace one of two builder fixtures: the narrow fibreglass stall that came with the house, or the large corner soaker tub on a tiled deck in a Maple, Vellore Village or Patterson ensuite. Taking out both the corner deck and the old stall frees up the best wall in the room for a bright glass shower with a built-in bench and recessed storage. See our charcoal marble ensuite case study for how that layout comes together.
A walk-in shower is also a practical choice if you plan to stay in your home long term. Including a curbless or low-curb entry, a tiled bench, a hand shower on a slide bar and solid wood blocking behind the tile for future grab bars costs very little while the walls are open, and saves a second renovation later. For mobility-focused layouts and tax credit details, see our accessible bathrooms in Vaughan page.
Options to consider for your shower
Curbless entry versus a low curb
A curbless shower has no step at the entrance. The bathroom floor tile runs straight into the shower, and the shower area slopes gently toward the drain. It looks clean, is easy to mop, and removes the trip hazard at the doorway. Because the shower floor must sit slightly lower than the surrounding room so water drains properly, the subfloor is either recessed between the joists or the main floor is built up. On an upper floor in a wood-framed Vaughan home, we inspect the joist type and direction before recommending a recessed pan.
A low-curb shower uses a slim step, usually three to four inches high, at the glass line. It works on any floor structure, keeps water contained easily, and costs less to frame than a recessed floor while still feeling open behind frameless glass.
Linear drains and centre drains
A linear drain is a narrow channel set along one wall or across the shower entry. Because the floor slopes in a single plane, you can carry large-format porcelain tiles straight across the shower floor, making it the natural partner for a curbless design. A centre point drain slopes from all four sides toward the middle, which pairs well with smaller mosaic floor tiles for grip and costs less in hardware and labour.
Frameless glass, niches and benches
Depending on the room width, you can choose a single fixed glass panel with a walk-in opening, a hinged frameless door and panel, or a full floor-to-ceiling enclosure that keeps steam inside. Custom glass is templated with a laser on the finished tile so it fits the walls tightly without wide metal channels.
Inside the shower, we frame recessed shampoo niches to match your tile courses so bottles stay off the floor, and build tiled corner or full-width benches at comfortable seating height. Most homeowners pair an overhead rain head with a handheld shower on a slide bar and a pressure-balanced or thermostatic mixing valve.
Shower niche dimensions, height and exterior wall rules
Homeowners planning a custom shower often ask how deep and how high a recessed shampoo niche should be built, and where it can safely go:
- Standard niche depth and height: Inside a standard 2x4 stud wall, a recessed niche finishes at about 3.5 inches deep, which holds full-size shampoo and body-wash bottles cleanly. We normally centre the main opening between 48 and 60 inches above the shower floor—chest to eye level for a standing adult—or position a lower niche beside a tiled bench for seated reach.
- Aligning with tile joints and sloping the sill: Rather than cutting a random rectangle into the wall, we size the niche height and width to match your porcelain tile layout lines and pitch the bottom quartz or porcelain sill slightly toward the shower pan so water never puddles in the corners.
- Why niches do not belong in uninsulated exterior walls: Cutting a recessed box into an outside house wall removes the fibreglass or spray-foam insulation and breaks the vapour barrier, which invites condensation and freezing against the back of the tile during an Ontario winter. When the shower sits against an exterior wall, we either frame the niche into an interior partition wall or fur out the wet wall so full insulation remains behind the waterproof membrane.
What a walk-in shower costs in Vaughan
Because most walk-in showers are built as part of an ensuite or main bathroom remodel, our published labour packages below show what the full installation costs before finish materials:
| Bathroom | What's included | Labour from |
|---|---|---|
| 4-piece primary ensuite with curbless shower9 x 12 ft |
| $11,500 |
| Wet room with shower and jetted tub15 x 8 ft |
| $15,000 |
Labour and installation only; finish materials (tile, tub, fixtures, vanity, glass) are extra. Prices in CAD before HST, updated November 6, 2026.
Finish materials such as porcelain or stone tile, the glass enclosure, the mixing valve, shower trim and linear drain are extra so you can pick the exact fixtures you want. If you are only rebuilding the shower stall and keeping the existing vanity and toilet, we price the job line by line. See our Vaughan bathroom renovation cost page for per-square-foot tile rates and individual line items.
How we build and waterproof a shower
- Demolition. The old stall, tub deck, tile and drywall come out down to the bare studs and subfloor.
- Structure and subfloor check. We inspect the framing and subfloor, repair any moisture damage, and recess the floor if the design is curbless.
- Rough plumbing. We install the new mixing valve and set the drain in the right spot.
- Framing and backing. We frame the niche, bench and curb, add wood blocking for glass hinges and grab bars, and install waterproof backer board.
- Continuous waterproofing. Every wall, the floor, the bench and the niche receive a continuous waterproofing membrane with sealed seams, inside corners and drain connection.
- Tile and grout. Floor and wall tile are set to the approved drawings, grouted and caulked at every change of plane.
- Fixtures and custom glass. Plumbing trim goes on, and the custom tempered glass is measured and installed. Read more about our step-by-step renovation process.
Vaughan permit and structural notes
Moving the shower drain requires a permit. If your new shower drain connects in the same spot as the old stall, no municipal permit is needed. If the drain moves to a new location, such as when replacing a corner tub and small stall with one centred walk-in shower, the City of Vaughan treats that as a plumbing alteration and requires a building permit.
Source: City of Vaughan: Plumbing permits (accessed October 10, 2026)Read our article on bathroom renovation permits in Vaughan for how the application and inspection work.
Upstairs joists vs. concrete basements. Newer subdivision homes in Vaughan often use engineered wood I-joists on the second floor, which cannot be notched arbitrarily to drop a shower pan. We check the framing early and explain whether a recessed curbless pan or a low curb is the safer structural choice. In a basement bathroom, cutting the concrete slab makes a curbless shower much simpler to achieve.
If you are removing a bathtub to build your shower, read our tub-to-shower conversion in Vaughan page, or upload photos of your bathroom for a free itemized quote.
Before and after
Real projects of this type. Drag the slider to compare.








Related projects

GTA project
Charcoal marble ensuite with a walk-in shower and bench
Glass walk-in shower in charcoal marble-look tile with a built-in bench and hex mosaic niche, plus a full-height grey double vanity.

GTA project
Accessible bathroom: tub out, curbless shower in
An orange-walled bathroom with a tub and shower surround became a bright room with a curbless walk-in shower, built-in bench and floating vanity.

Toronto project
Condo bathrooms in Liberty Village
Two condo bathrooms: a curbless glass shower with a walnut vanity in the main bath, and a green marble corner shower in the guest bath.
Walk-in Showers: common questions
Should I choose a curbless shower or a low curb?
Curbless looks cleaner, is easier to clean and is the safer choice for anyone with mobility concerns, but the floor has to be recessed or built up so water runs to the drain. A low curb is simpler and costs less. In an upstairs ensuite, we check the joists before recommending curbless.
Do I need a linear drain for a walk-in shower?
Not always. A linear drain lets the floor slope one way, so you can use large tiles and it suits curbless showers. A centre drain is fine for a curbed shower with smaller floor tile and usually costs less to install.
Why is the shower glass installed last?
Custom glass is measured on the finished tile, so we cannot order it until the walls and curb or floor are complete. That is why the glass is often the last piece installed. We plan the rest of the job so the wait does not hold up anything else.
How do you waterproof a tiled shower?
Tile and grout are not waterproof on their own, so the full shower area gets a continuous waterproofing membrane on the walls, floor, niche and bench, with sealed corners and drain connection. It is the part of the job you never see and the one that decides whether a shower lasts.
Other bathroom services

Full Bathroom Renovation
Down to the studs and rebuilt, with new plumbing, waterproofing, tile and fixtures.

Ensuite Renovation
Builder corner-tub decks removed for walk-in glass showers, double vanities, freestanding tubs and heated floors.

Tub-to-Shower Conversion
Replace a bathtub with a tiled walk-in shower that is easier to step into.

Bathtub Replacement
New alcove, drop-in or freestanding tubs, with the wall and floor rebuilt properly around them.

Small & Condo Bathrooms
Compact bathrooms and condo suites, planned around space, board rules and elevator bookings.

Basement Bathrooms
New basement bathrooms on existing rough-ins, or with drains added through the slab.

Accessible Bathrooms
Curbless showers, grab bars, seats and comfort-height fixtures for safer daily use.

Bathroom Repairs
Leaks into the ceiling below, failed showers, mould and fixing another contractor's work.

Powder Room Renovation
Main-floor 2-piece half baths rebuilt with floating vanities, stone tops, feature tile, skirted toilets and layered lighting.