Our Bathroom Renovation Process in Vaughan

Five clear steps from your first photos to the final walkthrough, so you know what happens each week, what we need from you, and how your home is protected.

Curbless shower floor during construction showing the continuous sheet waterproofing membrane, sealed seam bands and square drain bonding flange
Accessible bathroom: tub out, curbless shower in (GTA project)

The renovation process at a glance

  1. Quote from photos

    Send photos or a short video, or walk us through on a call. You get an itemized written quote.

  2. Visit and drawings

    We confirm what photos could not show and prepare drawings of the new layout for your approval.

  3. Permits and approvals

    If plumbing moves, we plan for the building permit. In a condo, the board approves first.

  4. Build

    Demolition, plumbing, electrical, waterproofing, tile, fixtures and glass, in that order.

  5. Walkthrough and service call

    We walk the room with you, and come back within the first year to fix minor issues.

1. Your written quote from photos or video

If you have been thinking about renovating a bathroom, the easiest way to start is with a few photos. Use our online quote form to upload up to five photos or short video clips, or call us to walk through the room on a phone, WhatsApp or video call.

The most helpful photos show the bathroom from the doorway, the tub or shower area, the floor, the ceiling, and the inside of the vanity cabinet where the supply lines and drain meet the wall. Let us know what you want to change and which Vaughan price range you are aiming for.

We send back an itemized written quote with each part of the job priced on its own line, showing what is included in labour and what is separate as finish material. In most homes our photo quote is very close to the final contract number. Where something cannot be confirmed from a photo, such as the framing under a shower or the subfloor around a toilet, we note it in writing.

2. In-home visit, measurements and layout drawings

The in-home visit happens after you have seen the numbers and want to move forward, not as a high-pressure sales call first. We measure the room, check the plumbing, ventilation and floor structure, and confirm the final written estimate so it becomes part of your contract.

Next, we prepare layout drawings and, if you want to picture the finishes together, a 3D plan. Here we settle the vanity width, door swing, niche height, bench dimensions, tile pattern, drain style and glass configuration. Making an adjustment on paper is free; moving a niche or drain once tile has started is expensive, so we take the time to get the drawings right with you first.

3. Building permits and condo board approvals

In the City of Vaughan, replacing a tub, shower, toilet or vanity in the same spot does not require a building permit. Moving or adding plumbing fixtures does, and every new basement bathroom requires a permit as well. When your layout calls for a permit, we build the City’s review and inspection stages into the schedule. Our article on bathroom renovation permits in Vaughan covers the details.

If you live in a condo near the Vaughan Metropolitan Centre or along Highway 7, the condominium board or property manager must approve the scope before work begins. We help prepare the alteration package, provide our WSIB clearance and insurance certificate, and book the service elevator. Read more on our small and condo bathrooms page.

4. The build sequence on site

A lasting bathroom depends on doing the work in the right order, especially the stages that disappear behind the finished tile:

  1. Home protection and demolition. We lay floor protection from your front door to the bathroom, seal the work area to control dust, remove the old fixtures and tile, and take demolition debris out the same day.
  2. Rough plumbing and electrical. New supply lines, drain alterations, the shower valve, GFCI circuits, pot lights, heated-floor wiring and a properly sized exhaust fan ducted outside.
  3. Framing and backer board. Framing for recessed niches, benches and half-walls, solid wood blocking for grab bars and heavy glass hinges, and moisture-resistant board.
  4. Waterproofing. A continuous waterproofing membrane across the shower floor, walls, bench and niche, with sealed corners and drain flange. See our walk-in showers page for why this step matters so much.
  5. Tile installation. Floor and wall tile set to the approved layout drawings, followed by grout and movement joints.
  6. Fixtures and finishing. Vanity, countertop, sinks, faucets, toilet, mirrors, lighting and paint.
  7. Custom shower glass. Frameless glass is measured on the finished tile so it fits the walls accurately, then installed as the final step.

Most full bathroom renovations take three to five weeks on site, while a straightforward tub-to-shower conversion typically takes one to two weeks.

How long a bathroom renovation takes by room size

Homeowners often ask how many days or weeks their specific bathroom will be out of service once demolition begins:

  • 2-piece powder room or tub-to-shower alcove conversion (about 1 to 2 weeks): Smaller footprint with fewer wall square feet to tile and no structural framing changes.
  • 3-piece 5 x 8 ft or 7 x 9 ft family hall bathroom (about 2 to 3 weeks): Covers full tear-out to the studs, rough plumbing and electrical, waterproof membrane, floor and tub-wall porcelain, vanity and toilet installation, and glass screen fitting.
  • 4-piece 9 x 12 ft builder ensuite remodel (about 3 to 4 weeks): Includes removing the old corner tub deck and stall, relocating drains, municipal rough-in inspection when applicable, building a curbless or low-curb walk-in shower, setting a double vanity, and measuring custom 10 mm frameless glass.
  • 5-piece wet room or slab-cut basement bathroom (about 4 to 5 weeks): Allows time for under-slab plumbing work or floor joist recessing, continuous room waterproofing, large-format slab tiling, freestanding tub installation and custom glass fabrication.

5. Final walkthrough and first-year service call

When the bathroom is complete, we walk through the room with you, test every fixture and drain, and address any punch-list item before closing out the job.

Every project includes our written labour warranty plus a service call within the first year to take care of minor settling items such as a cabinet door adjustment or a caulking touch-up. For tips on comparing quotes and contracts before you hire, see how to vet a bathroom contractor in Vaughan.

Common questions

Can I get a bathroom renovation quote without a home visit?

Yes. Send photos, a short video or a floor plan through our quote form, or walk us through the room on a phone, WhatsApp or video call. We send an itemized quote based on what we see. The in-home visit comes last, to confirm measurements and anything hidden before you commit.

Do you help with design and choosing finishes?

Yes. We prepare detailed drawings of the new layout for your approval before work starts, and can show it as a 3D plan. We help you choose a tile layout, niche and bench positions, vanity size, drain type and glass, and we flag choices that will add cost before you make them.

How do you protect the rest of my home during the work?

We cover the floors from the entrance to the bathroom, seal the doorway against dust, keep tools and materials in an agreed area, and clean up at the end of each day. Demolition debris leaves the house the day it comes out.